MANUFACTURE AND DELIVERY OF SWITCHBOARDS FOR TŘINECKÉ ŽELEZÁRNY – PLANT AND SHEARS SUBSTATION

Name of contract:    Switchboards – plant and shears substation
Term of delivery:      2017

SPECIFICATION
The project was built at the request to outfit the reconstructed substation for the plant and shears for the complete delivery and installation of switchboards for operations tied to this energy part of production at Třinecké železárny.

The switchboards were of atypical dimensions, made to order according to the requirements for sufficient reserves in the location of the reconstructed area. Technologically, the switchboards were divided into four sectors: RH111 – 24 units, RH112 – 11 units, RM137 – 4 units, RM138 – 4 units. The total is 43 switchboards.

 

BASIC CHARACTERISTICS

From the very beginning of this order, there was pressure on the delivery dates for the manufactured switchboards. We were nevertheless committed to meeting the customer’s requests and we managed the production and delivery, including the establishment of individual arrays and the connection of switchboards. The order was signed in mid-June 2017 and was completed at the end of July 2017 without defects, backlogs or later complaints, everything with maximum professional commitment.

 

 